We don’t rent energy. We make it.
Self-generated power at the gas wellhead. Right-sized AI factories for your organization’s compute needs.
Free capacity quote within 24 hours. No commitment.

The CVLG stack
Take as much of the stack as you want: raw megawatts, a turnkey build, or managed GPUs.
On-demand H200 clusters
Reserve dedicated H200s on live Texas capacity. Run inference today. Flat pricing, no hyperscaler.
Reserve compute →We design, build & source the hardware
We engineer the site, deploy the data center, and source the GPUs. You get a running AI factory.
Talk to an engineer →2–10 MW behind-the-meter sites
We develop and sell 2–10 MW fields on flared wellhead gas. Behind-the-meter, yours to build on.
Explore power sites →Texas flares more gas than any state. We turn that waste into American compute.

Compute Village · Texas
Powered by gas.
Not the grid.
Insight · 2026 · 4 min read
Behind-the-meter data centers on flared wellhead gas. Air-cooled, off-grid, zero demand on ERCOT. Exactly what Texas now requires.
“Data centers must bring their own power, reuse their own water, and reduce electricity costs.”
Gov. Greg Abbott
Read more ›Inference-first · built for model developers
Specialized inference. Train and serve on the same GPUs. Checkpoint to production without leaving the cluster.
One H200 cluster
Train → serve, same hardware
Pre-train
from scratch
Fine-tune
on your data
Deploy
zero migration
Serve
production inference
Our core. H200 clusters tuned for high-throughput, low-latency serving. Not a hyperscaler afterthought.
Pre-train, fine-tune, and post-train on the same hardware that serves the result.
The checkpoint that finishes training is serving traffic minutes later. No moving weights, no cold start.
Open by default
Served on vLLM or TensorRT-LLM. Your weights never leave your cluster.
Pricing
A fully-managed Production Sandbox, plus dedicated H200 bare metal. Reserve by the hour or month.
Fully Managed
Managed dev & prototyping
$599 / GPU-month · 730 hrs
Build and validate on a managed sandbox before you commit to a dedicated cluster.
Enter the Sandbox →Bare Metal
141 GB HBM3e · 8-GPU node
$2,694 / GPU-month · 730 hrs
Dedicated in our own gas-powered data centers.
Reserve compute →Renting compute taxes every unit of growth, egress, surge pricing, the grid queue. We flipped all three.
Months to years. Wait in the interconnection queue.
Under 90 days. Live on power that already exists.
$0.05–0.09 per GB to move your own data out.
Zero egress, ever. Your tokens move free.
Metered and elastic. Surges with demand.
Flat, energy-backed rate. Predictable at any scale.
The biggest cost, paid at grid rates.
A fraction of the cost. Self-generated at the wellhead, behind the meter.
Shared, multi-tenant infrastructure.
Dedicated & sovereign. Yours alone.
Locked to a vendor API.
Open models or your own weights. No lock-in.
The CVLG difference
Everyone else fights for grid megawatts in one mega-campus. We put compute right on top of cheap power, close to your demand.
Power at the source
Made at the wellhead. No grid. No interconnect queue.
Scales field by field
Add a container, add a field. Capacity that grows with you.
Resilient by distribution
Many small sites. No single point of failure.
Available now
The bottleneck isn’t the model, it’s the compute. We bring live capacity online in Texas in under 90 days.
Regulated workload? Dedicated, behind-the-meter isolation makes HIPAA, SOC 2, and data-residency straightforward.
Live capacity in under 90 days
Reserve in ROS-01 now. Your capacity comes online in under 90 days, no waitlist.
Scale in months, not years
New modular sites by replication. No multi-year interconnection queue.
Reserve and run
Lock your allocation, we provision, and your team is inferencing. Fast.
Specifications
Every cluster is a dedicated 8U node, 8× H200 on an HGX baseboard with a full-mesh 400G fabric and full root access, powered behind-the-meter. Sized to your workload, not a one-size cloud SKU.
8× NVIDIA H200
141 GB each · 1,128 GB HBM3e
Dual Intel Xeon 8570
112 cores · Emerald Rapids
2,048 GB DDR5 ECC
5,600 MT/s registered
61 TB NVMe
8× 7.68 TB local scratch
3.2 Tbps fabric
8× BlueField-3 400GbE RoCE
Full root access
SSH & IPMI, you control it all
Built by veterans of converged compute and enterprise HPC. A pioneer of one of the first converged, modular compute platforms (VCE’s Vblock), acquired by Dell, alongside a veteran of Chevron’s mission-critical oilfield compute. Two decades of enterprise buildouts.

A donated RTX 6000, an open build with the DorkOS project, and DorkOS creator Dorian Collier joining as VP of Product, Agents. The Lab’s first product spins out as Vault Cloud, shipping Fall 2026.

Texas flares more gas than any state in America. We put that waste asset to work. Modular AI data centers on the gas itself.

As GPU deployments scale to thousands of nodes, utilities face unprecedented challenges from voltage sags and frequency fluctuations. Regulated and unregulated utilities are innovating different solutions.

Stop paying for idle capacity, egress fees, and burst premiums. Here's how owned infrastructure removes the four hidden costs of rental models, layer by layer.

There's a better way. Private AI Cloud, Engineered. A dedicated platform you own with predictable cost and one vendor accountable end to end.

Compute Village has partnered with Proline, a Texas natural-gas producer, to power modular AI data centers on producing fields. Ready capacity you can reserve today.
Dedicated, behind-the-meter compute for researchers, model developers, and labs that need to own their stack.